Ausgrid is planning to install two poles either side of each transmission tower located between Woolooware and Kurnell. This will enable the removal of the existing steel lattice transmission towers.
This Project involves removal and replacement of 26 transmission towers, covering about 7 kilometres. The existing lattice steel towers are over 60 years old and are coming to the end of their serviceable life. It is no longer viable to continue to maintain these current structures.
The work will predominantly be installed within an existing Ausgrid easement. However, a section of the work will be installed on road reserve along Captain Cook Drive.
This work is part of our capital works program to allow Ausgrid to maintain a safe and reliable electricity network. This work is expected to be completed in stages over a two-year period.